Column Assembly and Preparation for Commissioning


Please sign in to view the rest of this entry.

Column Assembly and Preparation for Commissioning
10103021030900Column Assembly and Preparation for CommissioningThe column assembly and precommissioning period is most critical for assuring trouble-free operation. This is the last chance to detect any design or fabrication errors prior to startup. Flaws remaining hidden are likely to bring about poor performance and even mechanical damage. The prestartup cost and effort of rectifying flaws is often negligible, becoming enormous following the startup. In addition, new faults incurred during this period are extremely difficult to identify. Unlike the fabrication and design phases, which are usually well-documented by drawings, specifications, and correspondence, few (if any) recor…